My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-12_REVISION - M1986015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2021-02-12_REVISION - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:48:59 AM
Creation date
2/17/2021 6:15:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
REVISION
Doc Date
2/12/2021
Doc Name
Adequacy Review Response
From
Castle Aggregate
To
DRMS
Type & Sequence
AM5
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L—Reclamation Costs (Rule 6.4.12) <br /> • 37. Item #1 states there is no cost for reclaiming the former processing area located <br /> in the northeastern portion of Phase 1, south of the concrete batch plant, because <br /> those activities have been completed. During the November 2019 site inspection, it <br /> was noted that the majority of this processing area was still intact and there was no <br /> plan, at that time, to reclaim the area. Has this area in Phase 1 been reclaimed <br /> since November 2019?If the area still remains,provide details such as the <br /> dimension of the slabs and how they are reinforced, the number and dimension of <br /> any footers, and any details pertaining to conveyors on site. If it has been reclaimed <br /> please provide a summary of where the material, that remained onsite, was placed. <br /> • ➢ Response: The area in the Northeast corner of Phase 1 has been cleared of plant <br /> equipment and conveyors. Concrete has been removed and disposed of properly. <br /> Any concrete used as footings were constructed using precast blocks (2'x2'x4') <br /> of concrete and rebar. These blocks have lifting hooks installed that allow us to <br /> move and reuse the blocks offsite. No regrading or reseeding has occurred. <br /> ➢ The soils in this area will be used to construct the 3:1 slopes in Phase 1. Once <br /> the new slopes are constructed the excess soil will be used to backfill phase 7. At <br /> the completion of the sloping the area around the water storage vessel will be top <br /> soiled and reseeded as described in the amendment. <br /> • 38. Item #4, the batch plant release was begun in 2006. Maps associated with <br /> Amendments 3 and 4 approved in 2007 and 2011, respectively, all clearly portray <br /> the batch plant outside the permit boundary. <br /> ➢ Response: <br /> We understand no further action is needed. <br /> • 39. Phase 1 Cost Estimate—Please clearly show on the Reclamation Plan Map <br /> where the 12-acre area is located that the operator proposes to source the fill <br /> material for the pit slope reconstruction, it is not clear to the Division where this <br /> area is located on the map provided to other proposed Phase 1 items. <br /> ➢ Response: Refer to Map F-1 <br /> ✓ The 12.3 acres as outlined by the blue line is the proposed barrow area. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.