Laserfiche WebLink
Phase 7 <br /> Phase Seven consists of 1 project area. <br /> This is the final reclamation phase of Ridgetop Project Area. This consists of: <br /> Topsoil pile—Used for final grading, contouring. <br /> Ridgetop AOD—Topsoil applied to all areas, including areas under piles and reseeded. <br /> Total Area to be reseeded in this phase=0.124 acre <br /> Miners Mail commits to report ANY technical or surface use changes to BLM and DRMS as a revision or <br /> modification. We feel the time frame Of this nrniert start rlxtp\&ci i be snerified in a Later im_an�mant nr <br /> technical revision. No actual work or development of this project area will occur unless gaining prior <br /> approval from the DRMS to commence this phase. <br />