Laserfiche WebLink
To sum all the phases/project areas up in a spreadsheet.... <br /> Project Phases <br /> Area <br /> 1 2 1 3 1 4 1 5 1 6 1 7 <br /> Ridgetop Current Ridgetop Connector Connector Optimal Ridgetop Ridgetop Reseed <br /> Bonded Expansion Expansion Reclaim Operation Reclaim Reclaim Total <br /> Operation Phase Step 1 Step 2 <br /> Area of 0.04 0.053 0.053 0.053 0.048 0 0 <br /> Disturbance <br /> Support 0.01 0.005 0.005 0.005 0.003 0 0 <br /> Area <br /> Topsoil Pile 0.01 0.009 0.009 0.009 0.009 0.009 0 <br /> Waste Soil 0 0.007 0.007 0.007 0.007 0 0 <br /> Pile <br /> Waste Rock 0.01 0.022 0.022 0.022 0.022 0 0 <br /> Trails/ 0.014 0.014 0.014 0.014 0.014 0.014 0 <br /> Travel <br /> Public 0.010 0.010 0.010 0.010 0 0 <br /> Safety <br /> Fence <br /> Reseed i 0 i 0 0 0 0 0.037 0.124 0.161 <br /> Connector <br /> Area of 0 0 0.036 0.001 0.001 0 0 <br /> Disturbance <br /> Trails/ C 0 1I0.014 C.C14 0.014 C 0 <br /> Travel 1 <br /> Reseed 0 0 0 0.049 0 0.001 0 0.05 <br /> Area Totals 0.084 0.12 0.17 0.134 0.127 0.023 0.00 Seed <br /> Total <br /> 0.211 <br />