My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-04_REVISION - M2017035 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017035
>
2021-02-04_REVISION - M2017035 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:35:35 AM
Creation date
2/8/2021 6:47:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017035
IBM Index Class Name
REVISION
Doc Date
2/4/2021
Doc Name
Response To Application Consideration Notice
From
Miners Mall, LLC
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 5 <br /> Phase Five consists of 2 project areas. <br /> 1)Ridgetop Project Area: <br /> This is the optimal operational phase. All unused areas are in reclamation. <br /> 2)Connector Project Area: <br /> This is the optimal operational phase. All unused areas are in reclamation. Only access is via 0.001 <br /> acre area around the Connector Portal as a secondary exit to the Ridgetop underground operation. <br /> We intend to file AM-02 at this point for 2 proiect areas that are within the 200 foot line of CO-141. <br /> AM-02 will NOT interact with AM-01 other than a pre-existing trail to connect proiect areas. <br /> Phase 6 <br /> Phase Six consists of 2 project areas. <br /> This is the first of 2 phases to reclaim the entire operation. <br /> 1)Ridgetop Project Area: <br /> Portal—Structure will be removed to below reclamation line. The shaft will be backfilled with waste <br /> rock and dirt from storage areas, retaining enough waste dirt for final grading; before moving topsoil in <br /> next phase. There will be no access to the underground workings after this point from this portal. <br /> Public Safety Fence—will be removed and the impacted area reclaimed and reseeded. <br /> Waste Rock and Dirt Piles—will be used to backfill and grade the area around the portal. Areas that <br /> were under these piles will be reclaimed. <br /> Topsoil Pile—Retained for next phase. <br /> Support Area—Dismantled, reclaimed and reseeded. <br /> 2)Connector Project Area: _ <br /> r'UfLdI—irrr ef[�C11fMF wrrfUCrCrrIUVed TffiswffA,crw the bats tor atccs'threiunrrderg—f oi[fndwarkiT-gs <br /> Access to portal will be returned to BLM / DRMS via changing of locks. Area around portal reseeded. <br /> Total Area to be reseeded in this phase=0.037 acre <br />
The URL can be used to link to this page
Your browser does not support the video tag.