My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-21_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2021-01-21_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2021 6:00:29 PM
Creation date
1/25/2021 10:15:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
1/21/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Moffat County Mining, LLC
Type & Sequence
SL5
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parties of the inspection date and time via email. The site inspection was conducted in accordance with <br />Rule 3.03.2(2). Robin Reilley, M.S, GISP, of the DRMS conducted the inspection and Miranda Kawcak <br />of MCM was present throughout the inspection. No adequacy issues were identified during the <br />inspection. On 5 November 2020, DRMS sent the SL5 bond release inspection report to MCM, BLM, <br />OSM and the Colorado State Land Board via electronic mail. <br />Map I: Bond Release Block and collected elevation points <br />II. CRITERIA AND SCHEDULE FOR BOND RELEASE <br />PHASE I <br />Under Colorado's Permanent Program, the process of releasing the reclamation bond for a mine site is <br />explained in Rule 3.03 and further described in the Division's 1995 Guideline Regarding Selected Coal <br />Mining Bond Release Issues. Rule 3.03.1(2)(a) states: <br />"Up to sixty percent of the applicable bond amount shall be released when the permittee <br />successfully completes backfilling, regrading, and drainage control in accordance with <br />the approved reclamation plan." <br />With regard to Phase I bond release, the approved reclamation plan for the Williams Fork Mines calls for <br />backfilling and grading to establish a stable configuration blending with the surrounding terrain and <br />includes the reestablishment of effective drainage. Disturbed areas are rough graded to the approximate <br />Permit Number. C1981044 Page 4 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.