Laserfiche WebLink
activities, on-going mining and final site reclamation operations. This is an underground mining <br /> operation, and all mine waters will be treated to meet applicable water quality standards.These <br /> measures will protect against offsite damages. <br /> During site reclamation, described below, the reclaimed areas will be graded so as to blend in with <br /> the surrounding topography(Approximate Original Contour (AOC)), topsoiled, revegetated and <br /> mulched. It should be noted the post mining land use will be forest land and residential (historic <br /> cabin). <br /> (m) Specify whether the deposit/ore will be processed on site. If the <br /> deposit/ore will be processed,then describe the nature of the <br /> process,facilities and chemicals utilized.The process area and any <br /> structures must be described on Exhibit E - Map: <br /> Mining Method: <br /> No change under this Amendment. <br /> On-site Processing: <br /> No change under this Amendment. (Cross Mine ore will be processed at an offsite facility.) <br /> (n) Identify the primary,secondary and incidental commodities to be <br /> mined/extracted by the proposed operation, describe the intended use: <br /> The primary commodities mined are gold, silver, lead, zinc and copper. Secondary commodities <br /> are construction aggregate resulting from waste rock. Construction aggregate will be used locally <br /> for road construction and maintenance and used on-site. <br /> (o) Specify if explosives will be used in conjunction with the mining or <br /> reclamation. Demonstrate per section 6.5(4) under the Geotechnical <br /> Stability Exhibit that off site area will not be adversely affected by blasting <br /> during mining or reclamation operations: <br /> No change from the existing approved permit. <br /> (2) If tailings ponds are part of the milling process,the mine plan description should <br /> address the following: <br /> A tailing pond is not presently planned for the operation. <br /> (a) Plant Facilities: Describe the chemical types and quantities to be utilized, <br /> chemical storage and spill containment and emergency response plans for <br /> onsite spills. Plant operation details should include tank capacities and <br />