Laserfiche WebLink
Methods to be used to minimize disturbance to the surface and ground water systems <br /> including proposed dewatering, sediment containment or chemical treatment systems, storm <br /> water run-off controls and ground water points of compliance: <br /> Operational Ground Water Quality and Quantity Controls: <br /> No changes are proposed as part of this Amendment <br /> Stormwater Runoff Controls: <br /> See Storm Water Management Plan for Permit#COR 040242 (Exhibit N). <br /> Points of Compliance: <br /> No points of compliance are proposed at this time but will be addressed in a subsequent permit <br /> revision. <br /> (j) Specify how the operation will comply with applicable Colorado water laws <br /> and regulations governing injury to existing water rights: <br /> GI is currently in compliance with existing Colorado water laws and regulations governing injury to <br /> existing water rights, under its approved mining and reclamation permit. <br /> (k) Regardless of DMO status, if refuse and acid or toxic producing <br /> materials are exposed during mining, describe how they shall be <br /> handled and disposed of in a manner that will control unsightliness <br /> and protect the drainage system from pollution: <br /> Given the waste rock analyses completed to date, no acid producing material is anticipated. <br /> (1) Describe what measures will be taken to minimize disturbance to the <br /> hydrologic balance, prevent off-site damage,and provide for a stable <br /> configuration of the reclaimed area consistent with the proposed future <br /> use: <br /> GIR currently manages one permitted mine water discharge point, which discharges directly into <br /> Coon Track Creek under Colorado Department of Public Health and Environment (CDPHE)Water <br /> Quality Control Division (WQCD) National Pollutant Discharge Elimination System (NPDES) Permit <br /> CO-0032751. <br /> The permit boundary will be clearly marked to ensure all disturbances are within the approved <br /> permit area. No additional areas of disturbance, other than what are proposed as part of this <br /> Amendment shall occur. Storm water control measures will adhere to SWMP for all construction <br />