Laserfiche WebLink
operating solution volumes: <br /> NA <br /> (b) Tailings: Describe the geochemical constituents of the tailing or leached ore, <br /> the chemistry of any leachate, anticipated impacts to ground or surface <br /> waters and the design details of liners, ponds and embankments, diversions <br /> or chemical treatment facilities to be used to control these impacts,and <br /> ground and surface water monitoring systems,to include proposed ground <br /> water points of compliance: <br /> NA <br /> (c) Drainage Control: Describe the measures used to divert upland drainage away <br /> from the site both during and after operation. This must include design details <br /> demonstrating the capacity of ditches and impoundment structures to contain <br /> operating solutions and the volume of water generated by a one hundred (100) <br /> year 24-hour rainfall event. <br /> NA <br /> (d) Maps and Plans: Design drawings must, at a minimum, describe <br /> specific design details for tailing ponds and embankments, ponds <br /> and ditches, ore and tail transport systems, and ground and surface <br /> water monitoring systems: <br /> NA <br />