Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 9/29/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Clear sky, 65 degrees <br /> From: 12:00 To: 14:30 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Evan Valencia) 1 2.5 Kessler Reclamation 5 11 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 2.5 Excavator 1 11 <br /> Loader 1 11 <br /> Haul Truck 1 11 <br /> Skid Loader 1 11 <br /> Description of Work Performed: <br /> The perforated pipe and clean-out pipes were installed behind the headwall. Gravel was placed over the <br /> pipe behind the headwall. Riprap was placed above the gravel up the top of the headwall, leaving <br /> space to anchor the geoweb to the backside of the concrete on the headwall. <br /> The compacted subgrade was prepped for the channel to be excavated. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> The 24 inch bucket is on site for the channel to be dug for the ditch. Kessler's are hoping to carve <br /> at least 150 feet a day until it is complete. A smaller bucket is being acquired for excavating the key-in <br /> trenches along the geoweb channel, for the PVC anchors. <br /> Inspector: Evan Valencia Date: 9/29/2020 <br />