Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 11/13/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Sunny, windy, 55 degrees <br /> From: 11:00 To: 12:30 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Evan Valencia) 1 1.5 Kessler Reclamation 3 5 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 1 Excavator 1 4 <br /> Grizzly 1 4 <br /> Loader 1 4 <br /> Haul Truck 1 4 <br /> Description of Work Performed: <br /> Work on the road crossing continued. More material was screened. Gravel was used of backfill the aprons <br /> on the road, moving from center then outward. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> Inspector: Evan Valencia Date: 11/13/2020 <br />