Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 11/9/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Snowy, 30 degrees <br /> From: 11:00 To: 12:00 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No. <br /> Hours <br /> Oversight (Evan Valencia) 1 1 Kessler Reclamation 5 4 <br /> Contractor Equipment No. Totl Hours Subcontractor Equipment No. TotHours <br /> Passenger truck 1 1 Excavator 1 4 <br /> Grizzly 1 4 <br /> Loader 1 4 <br /> Haul Truck 1 4 <br /> Description of Work Performed: <br /> The excavator was removed from the road where it was supported the bollards. <br /> Materials and site prepped for work on the riprap basin tomorrow. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> Heavy snow began late morning, ending work for the day. <br /> Bike tracks were found near the excavator on site, showing that someone had trespassed over the <br /> weekend. No other evidence was found. <br /> Inspector: Evan Valencia Date: 11/9/2020 <br />