Laserfiche WebLink
Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 9/21/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Clear sky, 80 degrees <br /> From: 14:30 To: 15:30 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No Hours (by Labor Class) No. Hours <br /> Oversight (Evan Valencia) 1 1 Kessler Reclamation 5 10 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 1 Excavator 1 10 <br /> Loader 1 10 <br /> Water Truck 1 10 <br /> Haul Truck 1 10 <br /> Skid Loader 1 10 <br /> Compactor Roller 1 10 <br /> Description of Work Performed: <br /> Material screening continued. Temporarily stored dirt hauled into Minnesota Adit onsite. <br /> Work paused due to compactor roller malfunction. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> The compactor roller was not working properly, so a Wagner technician was brought on-site to <br /> Packing material on the ditch can not continue until the compactor roller is fixed. <br /> Inspector: Evan Valencia Date: 9/21/2020 <br />