Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 9/18/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Clear sky, 75 degrees <br /> From: 8:00 To: 12:30 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. <br /> Hours (by Labor Class) No. <br /> Hours <br /> Oversight (Sam Lowe) 1 4.5 Kessler Reclamation 6 4 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 1 Excavator 1 4 <br /> Loader 1 4 <br /> Water Truck 1 4 <br /> Haul Truck 1 4 <br /> Skid Loader 1 4 <br /> Compactor Roller 1 4 <br /> Description of Work Performed: <br /> 8:00 am: Met Burnco's pumping manager(Brian Salomon) to discuss pumping logistics of the <br /> site. With a favorable mix, the channel should be able to be pumped form 3 locations. <br /> 10:00-noon: Kessler redistributed the fill that had been placed near the seal wall (5 loads) which <br /> had enabled the concrete truck to pour the last section of wall. As fill was distributed water was <br /> added. The walk-behind compacter was working pretty well, but intermittently the connection <br /> with the remote would be lost. <br /> Being a Friday, the crew was only going to work until 2:00. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences, etc.) <br /> 9:00-10:00: 1 talked with Calvin about the upcoming schedule & logistics. Meeting the Oct 4 <br /> deadline will be tight for Kessler. Hopefully there are no more weather delays. <br /> Inspector: Sam Lowe Date: 9/18/2020 <br />