My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-28_GENERAL DOCUMENTS - M1977300
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977300
>
2020-12-28_GENERAL DOCUMENTS - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:39:23 AM
Creation date
12/30/2020 6:06:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
General Documents
Doc Date
12/28/2020
Doc Name Note
Part 2 of 3
Doc Name
North Waste Rock Pile Diversion
From
Colorado Legacy Land
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 9/18/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Clear sky, 75 degrees <br /> From: 8:00 To: 12:30 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. <br /> Hours (by Labor Class) No. <br /> Hours <br /> Oversight (Sam Lowe) 1 4.5 Kessler Reclamation 6 4 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 1 Excavator 1 4 <br /> Loader 1 4 <br /> Water Truck 1 4 <br /> Haul Truck 1 4 <br /> Skid Loader 1 4 <br /> Compactor Roller 1 4 <br /> Description of Work Performed: <br /> 8:00 am: Met Burnco's pumping manager(Brian Salomon) to discuss pumping logistics of the <br /> site. With a favorable mix, the channel should be able to be pumped form 3 locations. <br /> 10:00-noon: Kessler redistributed the fill that had been placed near the seal wall (5 loads) which <br /> had enabled the concrete truck to pour the last section of wall. As fill was distributed water was <br /> added. The walk-behind compacter was working pretty well, but intermittently the connection <br /> with the remote would be lost. <br /> Being a Friday, the crew was only going to work until 2:00. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences, etc.) <br /> 9:00-10:00: 1 talked with Calvin about the upcoming schedule & logistics. Meeting the Oct 4 <br /> deadline will be tight for Kessler. Hopefully there are no more weather delays. <br /> Inspector: Sam Lowe Date: 9/18/2020 <br />