Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 10/7/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Clear sky, no wind, 75 degrees <br /> From: 12:00 To: 13:30 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Sam Lowe) 1 5 Kessler Reclamation 2 1 <br /> H&H Lining 3 10 <br /> Joe Kaul 1 7 <br /> Ryan Andersen 1 3.5 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 1 <br /> Description of Work Performed: <br /> Finished the last section of geotextile. <br /> Began laying out GeoWeb. By 2:00 they were halfway through curve. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences, etc.) <br /> The 1:1 slopes are difficult to keep the geoweb tight against the bottom of the channel. <br /> Sandbags are being used to keep the GeoWeb against the graded channel, these will have to stay in <br /> place until concrete is poured into the GeoWeb. <br /> Much discussion about how to best fill the GeoWeb with concrete. Kessler is trying to find a small <br /> concrete pump to use. <br /> The connection of the upstream end of the channel liner and GeoWeb will be bolted to the back side <br /> of the seal wall. That work should be finished tomorrow. <br /> Inspector: Sam Lowe Date: 10/7/2020 <br />