Laserfiche WebLink
Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 9/2/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Clear, 75 degrees <br /> From: 7:30 To: 15:30 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Isaac Gonzalez) 1 4 Kessler Reclamation 6 8 <br /> Contractor Equipment No. TotHours Subcontractor Equipment No. TotHours <br /> Passenger truck 1 2 Excavator 1 8 <br /> Haul truck 2 8 <br /> Loader 1 2 <br /> Skid Steer 2 8 <br /> Description of Work Performed: <br /> Kessler Reclamation continued excavation down the channel/road. Excavated material is being stored <br /> temporarily in the valley floor to minimize haul truck driving time and shorten the total excavation time. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> Kessler expects to be done with excavation tomorrow <br /> Inspector: Isaac Gonzalez Date: 9/2/2020 <br />