My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-28_GENERAL DOCUMENTS - M1977300 (22)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977300
>
2020-12-28_GENERAL DOCUMENTS - M1977300 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:28:15 AM
Creation date
12/29/2020 5:26:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
General Documents
Doc Date
12/28/2020
Doc Name Note
Part 1 of 3
Doc Name
North Waste Rock Pile Diversion
From
Colorado Legacy Land
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 8/18/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Sunny, slight Haze from fires, 95 degrees <br /> From: 10:30 To: 13:00 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Sam) 1 2.5 Kessler Rec. 2 8 <br /> Tot <br /> Contractor Equipment No. Totl Hours Subcontractor Equipment No. Hours <br /> Excavator 1 4 <br /> Haul truck 1 4 <br /> Presence of Water: No Description: No longer visible due to first pour of wall. <br /> Description of Work Performed <br /> No work performed on the NWRP in the AM. <br /> Afternoon, Calvin and Wayne were going to start into excavation along the alignment. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> Calvin and Sam discussed the future sequence of the earth work. Kessler will start excavating <br /> to—8" below finished ditch grade. Then they will build up the alignment with clean fill until up to <br /> top of ditch bank elevations. Then they will excavate out the trapezoidal ditch section. <br /> Minor cleanup at the wall's trapezoid section was discussed; grout some small voids and grind any <br /> sharp edge or abnormality to limit chance of concrete damaging the geomembrane. <br /> Kessler sees hauling the contaminated fill directly to the Minnesota adit as time prohibitive and <br /> is hoping to get approval to stockpile fill in the valley bottom to keep NWRP productivity high. <br /> Inspector: Sam Lowe Date: 8/18/2020 <br />