My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-28_GENERAL DOCUMENTS - M1977300 (22)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977300
>
2020-12-28_GENERAL DOCUMENTS - M1977300 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:28:15 AM
Creation date
12/29/2020 5:26:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
General Documents
Doc Date
12/28/2020
Doc Name Note
Part 1 of 3
Doc Name
North Waste Rock Pile Diversion
From
Colorado Legacy Land
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 8/12/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Partly Cloudy, 90 degrees <br /> From: 9:00 To: 11:00am <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Sam) 1 3 Kessler Reclamation 5 10 <br /> Oversight (Evan V.) 1 2 <br /> Contractor Equipment No. TotHours Subcontractor Equipment No. TotHours <br /> Pickup Truck 2 1 Gator 1 <br /> Honda Generator 1 <br /> ShopVac 1 <br /> Power tools 3 <br /> Rebarbender 1 <br /> 4-wheeler 1 <br /> ,,,,...... ....... <br /> Description of Work Performed <br /> The Kessler crew was working on finalizing the rebar, swellstop, PVC penetration and Downstream <br /> face of the forms. <br /> Sam verified rebar spacing and wall width to match plans. <br /> Sam and Calvin separately calculated 4.94 CY and 4.88 CY of concrete needed for the 2nd pour. <br /> 5.5 CY is on order for tomorrow. <br /> 3 rows of Swellstop placed. Extra Swellstop placed at interface of west bedrock. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> Prior to tomorrow's pour, Kessler needs to place fill so concrete trucks can pour into the wall. <br /> Inspector: Sam Lowe with Evan Valencia Date: 8/12/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.