Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 8/13/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Sunny, 90 degrees <br /> From: 12:00 To: 15:00 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Evan) 1 3 Kessler Reclamation 5 10 <br /> Oversight (Jon) 1 1 AGW 1 2 <br /> Contractor Equipment No. TotHours Subcontractor Equipment No. TotHours <br /> Pickup Truck 1 3 Gator 1 <br /> Honda Generator 1 <br /> Vibrator 1 <br /> Power tools 3 <br /> Excavator 1 <br /> 4-wheeler 1 <br /> Haul truck 1 <br /> Description of Work Performed <br /> The Kessler crew finished finalizing the rebar, swellstop, PVC penetration and Downstream <br /> face of the forms. <br /> Material was brought up to the pile to build a ramp for the concrete pour. <br /> Concrete was poured in Water Capture Structure at 13:20. Pour was successful and filled the <br /> entirety of the form. <br /> Concrete tested by AGW, at 34.8 lb with air content of 6.5. Cylinders filled for pick up tomorrow. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> There was a 1/2 hour delay in the concrete truck arrival. <br /> Inspector: Evan Valencia Date: 8/13/2020 <br />