Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 9/14/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Partly cloudy, 65 degrees <br /> From: 14:30 To: 15:00 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No Hours (by Labor Class) No Hours <br /> Oversight (Evan Valencia) 1 0.5 Kessler Reclamation 5 8 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 1 Excavator 1 8 <br /> Loader 1 8 <br /> Grizzly Rock Screen 1 8 <br /> Water Truck 1 8 <br /> Description of Work Performed: <br /> The water truck was used on-site for the first time to add water to material for continued screening and <br /> packing. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> Inspector: Evan Valencia Date: 9/14/2020 <br />