Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 9/11/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Partly cloudy, 65 degrees <br /> From: 10:00 To: 11:00 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Evan Valencia) 1 1 Kessler Reclamation 5 8 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 1 Excavator 1 8 <br /> Loader 1 8 <br /> Grizzly Rock Screen 1 8 <br /> Description of Work Performed: <br /> A snowstorm prevented any work on the NWRP from 9/8-9/10. Work resumed today with the screening o <br /> material for the channel. Packing and grading will begin next week. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences, etc.) <br /> The following stretch of dry weather should make it possible to continue work. <br /> The water truck is on-site and in good condition. <br /> Inspector: Evan Valencia Date: 9/11/2020 <br />