My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-11_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-12-11_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:41:21 PM
Creation date
12/16/2020 4:35:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/11/2020
Doc Name Note
For SL21
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. PROPOSED DECISION <br /> Based on the observations above, the Division proposes to approve the request for a partial Phase I <br /> bond release for the Trapper Mine. This proposed decision will release the applicant from reclamation <br /> liability for Phase I bond release criteria for the SL21 bond release parcels; as per Table I above, <br /> totaling 298.3 acres. <br /> The current reclamation liability amount, as documented on the proposed decision form for permit <br /> revision No. 10 (PR10), is $30,003,478.68. Prior to the issuance of the final decision for PR10, the <br /> Division approved and issued Minor Revision 226 (MR226). MR226 allowed for TMI to affect 5.2 <br /> acres of land proposed to be affected with PR10. However in order to take advantage of the weather <br /> conditions prior to the onset of winter,TMI needed to affect this 5.2 acres of land prior to final approval <br /> of PR10. Since PR10 had not been issued, DRMS was required to increase the approved affected land <br /> and liability by 5.2 acres and$20,251.26.Now that PR10 is approved, essentially MR226 is moot and <br /> the affected land and liability approved with PR10 reflects the approved affected land acreage and <br /> liability amount.Therefore the liability associated with PR10 will be the basis for the liability reduction <br /> calculation associated with SL21.The Division currently holds a performance bond of$30,500,000.00. <br /> Post PR10 Estimate/Pre SL21 <br /> Phase Bond Release Area Cost Accounting <br /> Liability Acres Cost/Acre % <br /> PR 10 Worst Case $ <br /> Pre SL21 Bond 28,526,241.09 2839.71 $10,045.48 100% <br /> Phase I Bond Release 688,717.89 171.40 $4,018.19 40% <br /> Phase II Bond Release 788,519.71 523.30 $1,506.82 15% <br /> Requested <br /> Disturbance 206.7 <br /> TOTAL $30,003,478.69 3534.4 <br /> Phase Bond <br /> Release Acreage <br /> Phase 1 4386.2 <br /> Phase 2 4214.8 <br /> Phase 3 3691.5 <br /> Permit Number <br /> C1981010 <br /> Prepared by: R.Reilley,MS,GISP <br /> SL21 <br /> Page 14 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.