Laserfiche WebLink
J&T Consulting, Inc. Prowers Aggregate Operators LLC <br /> West Farm Pit <br /> 12/4/2020 <br /> FReciamation Bond Quantities and Costs <br /> T Consaltin L Ina <br /> Phase 6(195 02 acres) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Active Mining Area <br /> Topsoil Area Above Water Required for Phase 6 20.12 ac $2,541 $51,126 <br /> Revegetate Area Above Water Required for Phase 6 20.12 ac $1,100 $22,138 <br /> Cost of Slurry Wall Phase 6(35'avg Depth) 14,876 If $198 $2,952,142 <br /> Total Direct Cost $3,025,406 <br /> Overhead and Profit Cost(13.07%) $395,421 <br /> Contract Cost $3,420,827 <br /> Project Management(7.00%) $211,778 <br /> Additional Financial Warranty Required For Phase 6 $3,632,605 <br /> Phase 7(121.68 acres) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Active Mining Area <br /> Scarifying Ground in Disturbed Area(Credit from Above Surface Only Activity) (144.66) ac $322 -$46,515 <br /> Topsoil Area Above Water Required for Phase 7(Credit from Above) (144.66) ac $2,541 -$367,585 <br /> Revegetate Area Above Water Required for Phase 7(Credit from Above) (144.66) ac $1,100 -$159,172 <br /> Scarifying Ground in Disturbed Area 16.23 ac $322 $5,219 <br /> Topsoil Area Above Water Required for Phase 7 1623 ac $2,541 $41,241 <br /> Revegetate Area Above Water Required for Phase 7 1623 ac $1,100 $17,858 <br /> Cost of Slurry Wall Phase 7(40'avg Depth) 10,954 If $227 $2,484,367 <br /> Total Direct Cost $1,975,412 <br /> Overhead and Profit Cost(13.07%) $258,186 <br /> Contract Cost $2,233,598 <br /> Project Management(7.00%) $138,279 <br /> Additional Financial Warranty Required For Phase 7 $2,371,877 <br /> Phase 8(32 66 acres) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Active Mining Area <br /> Scarifying Ground in Disturbed Area(Credit from Above Surface Only Activity) (42.13) ac $322 -$13,547 <br /> Topsoil Area Above Water Required for Phase 7(Credit from Above) (42.13) ac $2,541 -$107,054 <br /> Revegetate Area Above Water Required for Phase 7(Credit from Above) (42.13) ac $1,100 -$46,356 <br /> Scarifying Ground in Disturbed Area 6.48 ac $322 $2,084 <br /> Topsoil Area Above Water Required for Phase 8 6.48 ac $2,541 $16,466 <br /> Revegetate Area Above Water Required for Phase 8 6.48 ac $1,100 $7,130 <br /> Cost of Slurry Wall Phase 8(35'avg Depth) 4,814 If $198 $955,338 <br /> Total Direct Cost $814,061 <br /> Overhead and Profit Cost(13 07%) $106,398 <br /> Contract Cost $920,459 <br /> Project Management(7.00%) $56,984 <br /> Additional Financial Warranty Required For Phase 8 $977,443 <br /> 4 of 5 <br />