Laserfiche WebLink
Prowers Aggregate Operators LLC <br /> J&T Consulting, Inc. <br /> West Farm Pit <br /> 12/4/2020 <br /> Famation Bond Quantities and Costs <br /> ConsnitiiniL Inc. <br /> Phase 9(91.38 acres) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Active Mining Area <br /> Scarifying Ground in Disturbed Area(Credit from Above Surface Only Activity) (108.84) ac $322 -$34,998 <br /> Topsoil Area Above Water Required for Phase 7(Credit from Above) (108 84) ac $2,541 -$276,566 <br /> Revegetate Area Above Water Required for Phase 7(Credit from Above) (108.84) ac $1,100 -$119,759 <br /> Scarifying Ground in Disturbed Area 12.50 ac $322 $4,019 <br /> Topsoil Area Above Water Required for Phase 9 12.50 ac $2,541 $31,763 <br /> Revegetate Area Above Water Required for Phase 9 12.50 ac $1,100 $13,754 <br /> Cost of Slurry Wall Phase 9(50'avg Depth) 9,259 If $284 $2,624,927 <br /> Total Direct Cost $2,243,141 <br /> Overhead and Profit Cost(13.07%) $293,178 <br /> Contract Cost $2,536,319 <br /> Project Management(7.00%) $157,020 <br /> Additional Financial Warranty Required For Phase 9 $2,693,339 <br /> Total Financial Warranty Required For All Phases $24,102,355 <br /> 5of5 <br />