Laserfiche WebLink
J&T Consulting, Inc. Prowers Aggregate Operators LLC <br /> West Farm Pit <br /> 12/4/2020 <br /> Reclamation Bond Quantities and Costs <br /> ©2020 JAT ConsnitiniL Ine. <br /> Phase 2 (75.09 acres)(Slurry wall has been constructed and leak test approved by State) <br /> Reclamation Operation Quantity Unit Unit Cost C ost <br /> Active Mining Area <br /> Topsoil Area Above Water Required for Phase 2 6.08 ac $2,541 $15,459 <br /> Revegetate Area Above Water Required for Phase 2 6.08 ac $1,100 $6,694 <br /> 20%Cost of Slurry Wall on Outside of Phase 2(60'avg Depth) 6,625 If $68 $450,765 <br /> Total Direct Cost $472,917 <br /> Overhead and Profit Cost(13.07%) $61,810 <br /> Contract Cost $534,728 <br /> Project Management(7.00%) $33,104 <br /> Additional Financial Warranty Required For Phase 2 $567,832 <br /> Phase 3(128.09 acres) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Active Minina Area <br /> Topsoil Area Above Water Required for Phase 3 14.33 ac $2,541 $36,413 <br /> Revegetate Area Above Water Required for Phase 3 14.33 ac $1,100 $15,768 <br /> Cost of Slurry Wall Phase 3(60'avg Depth) 10,607 If $340 $3,608,501 <br /> Total Direct Cost $3,660,682 <br /> Overhead and Profit Cost(13.07%) $478,451 <br /> Contract Cost $4,139,133 <br /> Project Management(7 00%) $256,248 <br /> Additional Financial Warranty Required For Phase 3 $4,395,381 <br /> Phase 4(237 82 acres) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Active Mining Area <br /> Topsoil Area Above Water Required for Phase 4 19.80 ac $2,541 $50,312 <br /> Revegetate Area Above Water Required for Phase 4 19.80 ac $1,100 $21,786 <br /> Cost of Slurry Wall Phase 4(50'avg Depth) 12,673 If $284 $3,592,796 <br /> Total Direct Cost $3,664,894 <br /> Overhead and Profit Cost(13 07%) $479,002 <br /> Contract Cost $4,143,896 <br /> Project Management(7.00%) $256,543 <br /> Additional Financial WarTanty Required For Phase 4 $4,400,439 <br /> Phase 5(164.44 acres) <br /> Reclamation Operation Quantity Unit Unit Cost U0st <br /> Active Mining Area <br /> Topsoil Area Above Water Required for Phase 5 19.12 ac $2,541 $48,584 <br /> Revegetate Area Above Water Required for Phase 5 19.12 ac $1,100 $21,038 <br /> Cost of Slurry Wall Phase 5(30'avg Depth) 14,142 If $170 $2,405,554 <br /> Total Direct Cost $2,475,177 <br /> Overhead and Profit Cost(13.07%) $323,506 <br /> Contract Cost $2,798,682 <br /> Project Management(7.00%) $173,262 <br /> Additional Financial Warranty Required For Phase 5 $2,971,945 <br /> 3of5 <br />