J&T Consulting, Inc. Prowers Aggregate Operators LLC <br /> ' West Farm Pit <br /> 12/4/2020 <br /> FRamation Bond Quantities and Costs <br /> AT Censnitiln&Ina <br /> Mon-Mining Areas (Surface Only Activity) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> West Wash Plant.Stockpile,and Sediment Pond Area <br /> Backfill Sediment Ponds 6,145 cyd $3 00 $18,435 <br /> Scarifying Ground in Disturbed Area 18.24 ac $322 $5,865 <br /> Topsoil Placement in Disturbed Area 18.24 ac $2,541 $46,348 <br /> Revegetate Disturbed Area 18.24 ac $1,100 $20,070 <br /> Parcel B Area <br /> Scarifying Ground in Disturbed Area 23.05 ac $322 $7,412 <br /> Topsoil Placement in Disturbed Area 23.05 ac $2,541 $58,571 <br /> Revegetate Disturbed Area 23.05 ac $1,100 $25,362 <br /> Radial Stacker Pad Concrete Removal 1.00 LS $3,000 $3,000 <br /> Stockpile and Plant Site Areas(Surface only in Phase 7) <br /> Scarifying Ground in Disturbed Area 14466 ac $322 $46,515 <br /> Topsoil Placement in Disturbed Area 144.66 ac $2,541 $367,585 <br /> Revegetate Disturbed Area 14466 ac $1,100 $159,172 <br /> Stockpile and Plant Site Areas(Surface only in Phase 8) <br /> Scarifying Ground in Disturbed Area 42.13 ac $322 $13,547 <br /> Topsoil Placement in Disturbed Area 42.13 ac $2,541 $107,054 <br /> Revegetate Disturbed Area 42.13 ac $1,100 $46,356 <br /> Stockpile.Sediment Pond Areas,&Scale House Area(Surface only in Phase 9) <br /> Backfill Sediment Ponds 17,655 cyd $3.00 $52,965 <br /> Scarifying Ground in Disturbed Area 108.84 ac $322 $34,998 <br /> Topsoil Placement in Disturbed Area 108.84 ac $2,541 $276,566 <br /> Removal&Disposal of Conveyer Ties,Wash Screen and Head Unit Pads 1.00 Is $19,000 $19,000 <br /> Revegetate Disturbed Area 108.84 ac $1,100 $119,759 <br /> Mobilization 1.00 Is $54,000 $54,000 <br /> Total Direct Cost $1,482,580 <br /> Overhead and Profit Cost(13.07%) $193,773 <br /> Contract Cost $1,676,354 <br /> Project Management(7.00%) $103,781 <br /> Financial Warranty Required For Initial Non-Mining Disturbed Areas $1,780,134 <br /> Phase 1 (36.31 acres)(Slurry wall has been constructed and leak test approved by State) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Topsoil Area Above Water Required for Phase 1 5.01 ac $2,541 $12,726 <br /> Revegetate Area Above Water Required for Phase 1 5.01 ac $1,100 $5,511 <br /> 20%Cost of Slurry Wall on South/East side of Phase 1 (70'avg Depth) 2,725 If $79 $216,311 <br /> Total Direct Cost $234,547 <br /> Overhead and Profit Cost(13.07%) $30,655 <br /> Contract Cost $265,203 <br /> Project Management(7.00%) $16,418 <br /> Financial Warranty Required For Phase 1 $281,621 <br /> 2of5 <br />