Laserfiche WebLink
J&T Consulting, Inc. Prowers Aggregate Operators LLC <br /> ' West Farm Pit <br /> 12/4/2020 <br /> FRamation Bond Quantities and Costs <br /> T Consulting,Inc. <br /> Summary of Unit Costs <br /> Costs Taken from TR S and Amendment i Bond Calculation by DRMS <br /> Direct costs Full Cost <br /> Backfill Placement $3.00 /cyd <br /> Scarifying Ground $321.55 /acre <br /> Re-applying topsoil 12"thick $2,541.03 /acre <br /> Revegetating disturbed area $1,100.32 /acre <br /> Mobilization $54,000.00 lump sum <br /> Slurry Wall Cost Breakdown($5.67 per sq-ft) 20%Cost <br /> Slurry Wall Cost(30 foot average depth) $170 /linear foot $34 /linear foot <br /> Slurry Wall Cost(35 foot average depth) $198 /linear foot $40 /linear foot <br /> Slurry Wall Cost(40 foot average depth) $227 /linear foot $45 /linear foot <br /> Slurry Wall Cost(50 foot average depth) $284 /linear foot $57 /linear foot <br /> Slurry Wall Cost(60 foot average depth) $340 /linear foot $68 /linear foot <br /> Slurry Wall Cost(70 foot average depth) $397 /linear foot $79 /linear foot <br /> Overhead and Profit Costs <br /> Liability insurance 2 02% of direct cost <br /> Performance bond 1.05% of direct cost <br /> Profit 10 00% of direct cost <br /> Total Overhead Cost 13.07% of direct cost <br /> Project Management <br /> Engineering and bidding 2.00% of direct cost <br /> Management and administration 5.00% of direct cost <br /> Total Additional Cost 7.00% of direct cost <br /> Disturbed Areas (Reclamation of These Areas are Complete) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Disturbed Areas West of Pit Road Adiacent to Phase 1/Ditch to River <br /> Scarify Ground in Disturbed Area 3.09 ac $322 $994 <br /> Topsoil Disturbed Area 3.09 ac $2,541 $7,852 <br /> Revegetate Disturbed Area 3.09 ac $1,100 $3,400 <br /> Parking Area <br /> Scarifying Ground in Disturbed Area 3.16 ac $322 $1,016 <br /> Topsoil Placement in Disturbed Area 316 ac $2,541 $8,030 <br /> Revegetate Disturbed Area 3.16 ac $1,100 $3,477 <br /> Total Direct Cost $24,768 <br /> Overhead and Profit Cost(13.07%) $3,237 <br /> Contract Cost $28,005 <br /> Project Management(7.00%) $1,734 <br /> Financial Warranty Required For Disturbed Areas $29,739 <br /> 1 of 5 <br />