My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-30_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2020-11-30_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 4:54:58 AM
Creation date
11/30/2020 11:49:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Revision
Doc Date
11/30/2020
Doc Name
Adequacy Review Response
From
Colorado Legacy Land
To
DRMS
Type & Sequence
AM5
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO LEGACY LAND <br /> SCHWARTZWALDER MINE <br /> JIF <br /> CK FO CK ECLAMATI0 F-2.BLA <br /> -T lteSAL Unit Cost Quantity Total Cost Notes <br /> Backfill Materials <br /> Fill Soil $8.00/CY 60 CY $480.00 Inert fill from site. <br /> Top Soil $14.50/CY 10 CY $145.00 <br /> Seed Mix $450/acre 0.1 acre $45.00 Seed mix shown in Table E-1 <br /> Mulching $35.00/CY 10 CY $350.00 <br /> Rock $650/ton 4 tons $2,600.00 Rock fill from site. <br /> Excavator $120.00/hour 8 hours $960.00 1 day. <br /> Loader $120.00/hour 8 hours $960.00 1 day. <br /> Truck $115.00/hour 8 hours $920.00 1 day. <br /> Labor $42.00/hour 48 $2,016.00 Team of 3 people for 2 days each. <br /> . `Cost Total <br /> $8,476.00 Subtotal of direct costs(equipment and materials) <br /> $360.23 Engineering Word&/or Contract/Bid Prep. <br /> 4.25%of direct costs <br /> $423.80 Reclamation management&/or Admin. <br /> 5%of direct costs <br /> $9,260.03 Grand total <br /> NOVEMBER2020 52 AMENDMENT5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.