Laserfiche WebLink
COLORADO LEGACY LAND <br /> SCHWARTZWALDER MINE <br /> TABLE L-1.SCHWARTZWALDER MINE RECLAMATION COSTS <br /> Source Amount Description J& Not <br /> Kessler quote per TR-23,includes topsoil <br /> $88,389 Waste Rock Pile Cap seed and mulch <br /> $1,470,327 Subtotal(Direct Costs) <br /> Alluvial Fill(DRMS Indirect Costs) <br /> $29,701 Liability Insurance 2.02%of Direct Costs <br /> $15,438 Performance Bond 1.05%of Direct Costs <br /> $23,565 job superintendent 322.59 hrs @$65.41 <br /> $147,033 Profit 10%of Direct Costs <br /> $215,737 Subtotal(Indirect Costs) <br /> Alluvial Fill(Eng/Management) <br /> Engineering Word&/or Contract/Bid <br /> $71,658 Prep 4.25%of Direct and Indirect Costs <br /> $84,303 Reclamation management&/or Admin. 5%of Direct and Indirect Costs <br /> $155,961 Subtotal(Eng/Management) <br /> Other $1,187,529 Denver Water, Water Treatment(Contingent cost) <br /> Total <br /> Bo - 8,90 w., <br /> Reclamation costs for the North Waste Rock Pile Upland Area and Former Black Forest Mine are presented in <br /> Table L-2. The surface expression of both proposed areas is unimpacted. Therefor no grading,topsoiling, or <br /> revegetation for these areas are required. Costs in Table L-2 are specifically for the backfilling of the main <br /> portal and escape portal of the Black Forest Mine. These costs are provided as a basis of estimate only. <br /> However, it is not recommended that the full bond listed in Table L-1 be amended due to ongoing surety <br /> evaluations and bond reductions for completed reclamation work. <br /> NOVEMBER 2020 51 AMENDMENT 5 <br />