Laserfiche WebLink
COLORADO LEGACY LAND <br /> $CHWARTZWALDER MINE <br /> RWARTZWALDER MINE RECLAMATION COSTS <br /> 7s, <br /> Description Notes <br /> 60 RO System Operation year 1 to 10 Year 1 to 5:RO system runs half-time(at <br /> $139,636/yr)and on standby half-time(at <br /> $15,000/yr);see attached detail <br /> Year 6 to 10:Continue to run as in Year 1 to <br /> $1,546,360 RO system Operation year 11 to 20 5 <br /> WebMaster Remote Monitoring System Included in cost of RO systems <br /> $22,200 Mine Pool Sampling Years 1 to 10 <br /> $22,200 Mine Pool Sampling Years 11 to 20 <br /> $4,002,120 Subtotal(Direct Costs) <br /> Mine Dewatering&InSitu Treatment(DRMS Indirect Costsl <br /> $80,843 Liability Insurance 2.02%of Direct Costs <br /> $42,022 Performance Bond 1.05%of Direct Costs <br /> Site personnel covered in RO system <br /> Job superintendent operation <br /> $400,212 Profit 10%of Direct Costs <br /> $523,077 Subtotal(Indirect Costs) <br /> Mine Dewatering&InSitu Treatment(Engineering/Management) <br /> Engineering Word&/or Contract/Bid <br /> $192,321 Prep 4.25%of Direct and Indirect Costs <br /> $226,260 Reclamation management&/or Admin. 5%of Direct and Indirect Costs <br /> $418,581 Subtotal(Engineering/Management) <br /> AM-04 $1,842,025 Aluvial Fill(Total Cost) <br /> Alluvial Fill(Direct Costs) <br /> Demobe-all heavy equipment already on <br /> $74,000 Mobilization site <br /> Kessler Quote per TR-23,includes old water <br /> $246,400 Demo and Debris Removal treatment building and other site structures. <br /> Kessler Quote per TR-23,excavate,haul and <br /> place on waste rock piles,1 construction <br /> $287,325 Excavate,Haul and Place season. <br /> $10,000 Lab Analysis Soils 50 verification samples <br /> $15,000 Lab Analysis Water 100 samples during excavation. <br /> $48,000 Modify/Demo sumps Pipes,pumps,electrical modifications. <br /> Possible 3 new/relocated monitor wells at <br /> $24,000 Modify monitor wells $8,000 each <br /> Inert fill to come from site,no credit taken <br /> $138,600 Purchase Inert Fill for discount <br /> Inert fill from site-haul charge reduced to <br /> $214,500 Haul and Place Fill essentially zero. <br /> $50,750 Purchase Top Soil Purchase 3,500 cy of top soil <br /> $112,000 Haul and Place Top Soil Haul and place 3,500 cy of top soil <br /> $28,000 Revegetate Purchase and distribute 3.5 acres <br /> Kessler quote per TR-23,includes <br /> $133,363 Concrete V-ditch Storm Water Drain construction and materials <br /> NOVEMBER 2020 50 AMENDMENT 5 <br />