Laserfiche WebLink
066B Haul Cuttings to NW Mains Vent Shaft for TRUCKI 1 40.44 $90,170 <br /> Backfill <br /> 066C NW Mains Vent Shaft-Push Cuttings Into Pit DOZER 1 12.23 $4,455 <br /> 066D Backfill geotechnical test-pits,MR295 EXCAVATE 1 14.86 $1,129 <br /> 066E Backfill and Grade 9 East Utility Borehole Pad DOZER 1 6.35 $2,464 <br /> 066F Permanent Coal Fine Disposal from FCB Spill; TRUCKI 1 1.72 $533 <br /> MR297 <br /> 067 Compact Coal Stockpile Footprints at Refuse Pile COMPACT 2 181.24 $94,112 <br /> 068 Compact Temporary Storage Refuse in Area 3 COMPACT 2 17.52 $9,098 <br /> 070 Regrade,Disperse Surfacing,and Rip Main Haul DOZER 1 21.15 $8,397 <br /> Road <br /> 071 Regrade,Disperse Surfacing,and Rip Haul Road B DOZER 2 28.14 $22,354 <br /> 073 Regrade,Disperse Surfacing,and Rip Haul Road C DOZER 2 7.79 $6,186 <br /> 074 Regrade,Disperse Surfacing,and Rip Shop Access DOZER 2 5.81 $4,617 <br /> Road <br /> 075 Regrade and Rip Explosives Storage Area Access DOZER 1 9.82 $3,900 <br /> Road <br /> 076 Regrade,Disperse Surfacing,and RipBrown DOZER 1 6.06 $2,405 <br /> Palace Access Road <br /> 077 Regrade,Disperse Surfacing,and Rip Training DOZER 1 8.02 $3,184 <br /> Center Access <br /> 078 Regrade,Disperse Surfacing,and Rip Weigh DOZER 1 11.10 $4,408 <br /> Station Access <br /> 079 Regrade,Disperse Surfacing,and Rip Fish Creek DOZER 1 5.29 $2,100 <br /> Bore Access <br /> 080 Regrade,Disperse Surfacing,and Rip Fish Creek DOZER 1 14.38 $5,710 <br /> Tipp Access <br /> 082 Regrade and Rip Equipment Storage Area and DOZER 1 5.08 $2,018 <br /> Access Road <br /> 083 Regrade and Rip Pond T Access Road DOZER 1 0.85 $337 <br /> 084 Regrade and Rip Wastewater Facility Ramp and DOZER 1 26.04 $10,341 <br /> Access Road <br /> 085 Regrade and Rip 6 North Main Ditches and Access DOZER 1 8.48 $3,368 <br /> Road <br /> 086 Regrade and Rip 16 Left Grout Borehole Access DOZER 1 1.18 $468 <br /> Road <br /> 087 Regrade and Rip 16LT Utility Borehole Access DOZER 1 43.42 $17,243 <br /> Road <br /> 088 Regrade and Rip 15LT Vent Shaft Access Road DOZER 1 2.74 $1,088 <br /> 089 Rip and Bulldoze Surface Material on Northwest DOZER 1 6.97 $2,768 <br /> Vent Shaft Pa <br /> 090 Rip West Haulroad Truck Scale and Ramp RIPPER 1 3.18 $1,263 <br /> 091 Remove Gravel Fill at Batch Weigh Haulroad TRUCKI 1 7.04 $7,840 <br /> 092 Load/Haul Northwest Main Vent Shaft Pad and TRUCKI 1 13.58 $15,418 <br /> Access Road Mate <br /> 093 Remove Gravel from 6 North Main Access Road TRUCKI 1 3.90 $2,917 <br /> 094 Remove Gravel from West Haulroad TRUCKI 1 1.67 $1,251 <br /> 095 Remove and Haul Parking Expansion Asphalt TRUCKI 1 1.63 $1,046 <br /> 096 Remove 18 Left Vent Shaft Pad,Substation and TRUCKI 1 11.53 $14,466 <br /> Access Road Ma <br /> 097 Remove Refuse Disposal Area Expansion SCRAPERI 1 5.28 $6,323 <br /> Haulroad Base <br /> 098 Regrade Access Roads;TRO Coal Quality DOZER 1 19.44 $5,041 <br /> Coreholes 5-10,MR272 <br /> 099 Regrade Light-Use Road;5MN Borehole MR283 DOZER 1 6.96 $2,397 <br /> 100 Rip New CRDA Topsoil Stockpile Access Road; RIPPER 1 0.82 $289 <br /> MR290 <br />