Laserfiche WebLink
032 Regrade 16LT Pad DOZER 1 8.62 $3,327 <br /> 033 Regrade 0.6 Acres Associated with Underflow GRADER 1 0.17 $27 <br /> Pipelines <br /> 034 Regrade Stockpile Footprint,Ditches,and Fuel Pad GRADER 1 0.88 $136 <br /> 035 Regrade 19 RT Pipeline Corridor GRADER 1 2.12 $327 <br /> 036 Regrade 18 LT Pipeline Corridor GRADER 1 2.22 $341 <br /> 037 Push Low Quality Coal into Pit DOZER 2 560.05 $408,125 <br /> 038 Push 6 North Main Cuttings into Shaft DOZER 1 28.45 $10,984 <br /> 039 Backfill 18 LT Vent Shaft Cuttings Pit DOZER 1 42.13 $16,213 <br /> 040 Remove Spoil Material from Coal Handling SCRAPERI 1 41.03 $57,112 <br /> Facility Area <br /> 041 Haul ROM Stockpile Footprint to Refuse Pile SCRAPERI 2 24.99 $64,689 <br /> 042 Haul Batch Weigh Stockpile Footprint to Refuse SCRAPERI 1 7.53 $10,484 <br /> Pile <br /> 043 Haul Remaining Stoker Coal to Refuse Pile SCRAPERI 1 14.10 $24,772 <br /> 044 Haul Belt-Out-Back Footprint to Refuse Pile SCRAPERI 2 47.76 $123,623 <br /> 045 Haul Fill from South of Portals to Train Load Out SCRAPERI 1 31.20 $54,799 <br /> Area <br /> 046 Haul Clay Material to Refuse Disposal Area for SCRAPERI 2 34.03 $81,432 <br /> Cover <br /> 048 Spread Temporary Storage Refuse Material DOZER 2 42.09 $32,397 <br /> 049 Backfill and Regrade Mud Pits for EMD Water DOZER 1 2.06 $533 <br /> Monitoring Wells <br /> 050 Backfill and Regrade Access Roads EMD Water DOZER 1 4.92 $1,277 <br /> Monitoring Well <br /> 051 Regrade Roads and Pads for the TRO Coal Quality DOZER 1 5.83 $1,512 <br /> Coreholes <br /> 052 Regrade D.Pad/Mud Pits/PipelineCorr.;7RT DOZER 1 11.15 $2,891 <br /> Thickener BH/Pi e <br /> 053 Load/Haul Road Base from Monitoring Hole TRUCKI 1 2.93 $1,201 <br /> Access Road MR271 <br /> 054 Regrade Drill Pads/Mud Pits;TRO Coal Quality DOZER 1 5.73 $1,487 <br /> Coreholes 5-10 <br /> 055 Remove Employee Coal Stockpile to Refuse Pile; TRUCKI 1 2.20 $532 <br /> MR274 <br /> 056 Grade DrillPads/MudPits/12,250'Access Rd WCR DOZER 1 48.88 $12,674 <br /> Corehole MR275 <br /> 057 Regrade DrillPads/MudPits;WCR Sup.Coreholes DOZER 1 5.73 $1,487 <br /> MR276 <br /> 058 Regrade Add.Dist.of DrillPads/MudPits;WCR DOZER 1 87.21 $22,611 <br /> Coreholes MR277 <br /> 059 Grade DrillPads/MudPits;WCR Sup.Coreholes DOZER 1 15.55 $4,033 <br /> MR278 <br /> 060 Regrade Access Roads;WCR Sup.Coreholes DOZER 1 17.77 $4,609 <br /> MR278 <br /> 061 Regrade Drill Pads and Mud Pits;WCR Offset DOZER 1 79.15 $20,523 <br /> Drilling MR280 <br /> 062 Regrade Access Roads;WCR Offset Drilling; DOZER 1 11.39 $2,952 <br /> MR280 <br /> 063 Regrade Drill Pad;5MN Cement BH MR283 DOZER 1 3.98 $1,370 <br /> 064 Regrade Riser Area;5MN Pipeline MR288 GRADER 1 0.61 $63 <br /> 065 Regrade Drill Pad/Mud Pit; 10 East-Mid Pan. DOZER 1 6.64 $1,723 <br /> Emergency MR289 <br /> 066 Grade New CRDA Topsoil Pile Area and Access GRADER 1 1.04 $151 <br /> Road;MR290 -7 <br /> 066A Regrade 13LT Outby Utility Borehole Pad Area; DOZER 1 6.45 $1,684 <br /> MR291 <br />