Laserfiche WebLink
100a Regrade 13LT Outby Utility Borehole Road Area; DOZER 2 7.74 $4,041 <br /> MR291 <br /> 100b Rip and Regrade 9 East Utility Borehole Road DOZER 2 3.03 $2,368 <br /> (MR296) <br /> 101 Regrade Ditch D-3 DOZER 1 29.24 $2,575 <br /> 102 Regrade Ditch E-1 DOZER 1 12.63 $1,112 <br /> 103 Regrade Ditch F-1 and Pond F Ditches DOZER 1 21.26 $1,872 <br /> 104 Regrade Ditches G-la,G-lb,G-lc,and Million DOZER 1 25.90 $2,281 <br /> Gallon Tank No <br /> 105 Regrade Ditch G-4 DOZER 1 19.27 $1,696 <br /> 110 Backfill and Regrade Pond B DOZER 1 7.61 $2,771 <br /> III Backfill and Regrade Pond C DOZER 1 19.94 $7,266 <br /> 112 Backfill and Regrade Pond D DOZER 1 22.43 $8,174 <br /> 113 Backfill and Regrade Pond E DOZER 1 17.45 $6,357 <br /> 114 Backfill and Regrade Pond F DOZER 1 27.57 $10,046 <br /> 115 Backfill and Regrade Pond G DOZER 1 34.46 $12,558 <br /> 116 Backfill and Regrade Pond T DOZER 1 2.44 $890 <br /> 117 Backfill and Regrade 6 North Main Holding Pond DOZER 1 35.97 $13,108 <br /> Embankments, <br /> 118 Backfill and Regrade 18 Left Vent Shaft Ponds DOZER 1 8.10 $2,953 <br /> 120 Backfill and Regrade Passive Treatment Ponds DOZER 3 33.06 $36,142 <br /> 121 Replace Topsoil on 6 North Main Treatment ponds DOZER 1 63.28 $11,864 <br /> 122 Regrade 6MN Passsive Treatment ponds and inlet GRADER 1 6.03 $925 <br /> mod <br /> 123 Haul Riprap from 6MN passive treatment ponds TRUCKI 1 11.98 $8,013 <br /> 130 Replace Topsoil at Portal Surface Area SCRAPERI 2 38.43 $85,473 <br /> 131 Replace Topsoil at OfficeBathouse SCRAPERI 2 39.54 $87,939 <br /> 132 Replace Topsoil at Parking Lot and Laydown Area SCRAPERI 2 51.83 $115,280 <br /> 133 Replace Topsoil at Stoker Coal Loading Area SCRAPERI 1 1.29 $1,802 <br /> 134 Replace Topsoil at Refuse Area,Refuse Area SCRAPERI 3 203.00 $678,828 <br /> Expansion Phase <br /> 135 Replace Topsoil on Haulroad B SCRAPERI 1 62.69 $105,313 <br /> 136 Replace Topsoil on Fish Creek Borehole Area and SCRAPERI 1 9.72 $16,330 <br /> Road <br /> 137 Replace Topsoil on Explosives Storage Area SCRAPERI 1 4.54 $6,313 <br /> 138 Replace Topsoil on Truck Loadout and Haulroad C SCRAPERI 1 55.72 $77,563 <br /> 139 Replace Topsoil on Pond E and Haulroad B SCRAPERI 1 4.00 $5,561 <br /> 140 Replace Topsoil on Pond E Relocation Area SCRAPERI 1 9.45 $13,159 <br /> 141 Replace Topsoil on Batch/Weigh Loadout SCRAPERI 1 3.91 $5,443 <br /> Stockpile Area <br /> 142 Replace Topsoil on 18 Right West Portion Access SCRAPERI 1 3.23 $3,861 <br /> Road <br /> 143 Replace Topsoil on 18 Right East Central Portion SCRAPERI 1 2.03 $2,426 <br /> Access Road <br /> 144 Replace Topsoil on 18 Right Northeast Portion SCRAPERI 1 0.60 $715 <br /> Access Road <br /> 145 Replace Topsoil on West Haulroad SCRAPERI 1 0.63 $748 <br /> 146 Replace Cover Material on Refuse Disposal Area SCRAPERI 3 154.21 $515,691 <br /> 147 Replace Topsoil on Main Facilities SCRAPERI 1 7.00 $11,764 <br /> Access/Haulroad Area <br /> 148 Haul and Replace Topsoil to Fish Creek Tipple TRUCKI 1 31.01 $43,508 <br /> 149 Haul and Replace Topsoil to "Trudy's Comer" TRUCKI 1 12.46 $17,482 <br /> Laydown Area <br /> 150 Replace Topsoil on 10 Right Dewatering Borehole DOZER 1 14.35 $2,691 <br /> 151 Replace Topsoil on Eastern Mining District Vent DOZER 1 95.34 $17,875 <br /> Shaft Area <br />