Laserfiche WebLink
TASK 001 STRUCTURE DEMO BREAKDOWN <br /> Structure or Item Description Dimensions Demolition Quantity Unit Unit Cost Total Cost SL5 <br /> Menu Selection <br /> -Footers 1'x2'x252 LF Demo.and on-site disposal in excavated pit, 252.00 LF $3.58 $902.16 <br /> 1.0 ft.x 2 ft.-Max.200 ft.push <br /> $902.16 <br /> -Pad 70'x60'x6" Demo.and on-site disposal in excavated pit,6 4,200.00 SF $0.85 $3,582.60 <br /> in.thick-Max.200 ft.push $3582.60 <br /> 36-inch Overland 900 LF Conveyor, 15.00 EA $2,825.00 $42,375.00 <br /> Conveyor to Sample Building Horizontal Belt 24"Belt,61.5' <br /> Length $42375.00 <br /> Silo Transfer Conveyor;Sample 600 LF Conveyor,Horizontal Belt 24"Belt,61.5' 10.00 EA $2,825.00 $28,250.00 <br /> Building to Silo Length $28250.00 <br /> Silo;10,000 Storage Silo 70'D x 25'h Explosive demolition,large projects-Concrete 384,845.00 CF $0.28 $107,756.60 <br /> structures <br /> $107756.60 <br /> -Push Concrete into 14000 CY Cat D10T- 16.00 EA $292.54 $4,680.64 <br /> fill 10SU $4680.64 <br /> -Silo Footers 2'x 3'x 220LF Demo.and on-site disposal in excavated pit, 220.00 LF $10.75 $2,365.00 <br /> 2.0 ft.x 3 ft.-Max.200 ft. <br /> push <br /> $2365.00 <br /> Laboratory/Sample Building Trailer Bldg.(SN)demo./on-site disposal in excavated 1,792.00 CF $0.20 $353.02 <br /> pit- <br /> Max.200 ft.push $353.02 <br /> Remove Rail Spur 11600 LF Railroad track- 11,600.00 LF $9.19 $106,604.00 <br /> Ties and track $106604.00 <br /> -Remove Ballast 3900 CY Railroad track-Ballast 3,900.00 CY $4.67 $18,213.00 $18213.00 <br /> Electrical Substations(4) 4 NON-PCB 4.00 EA $2,082.20 $8,328.80 <br /> Transformer Removal $8328.80 <br /> -Pad 20'x 20'x Demo.and on-site disposal in existing pit,6 in. 400.00 SF $0.81 $325.20 <br /> 6" thick-Max. <br /> 200 ft.push $325.20 <br /> -Fencing 750 LF Fencing,chain link,including posts and 750.00 LF $3.06 $2,295.00 <br /> fabric-8 ft.to 10 ft.high $2295.00 <br /> Fuel Island at No.5 Portals 30'x 40'x Demo.and on-site disposal in excavated pit,6 1,200.00 SF $0.85 $1,023.60 <br /> 6" in.thick- <br /> Max.200 ft.push $1023.60 <br /> Overland Conveyor-P5 to Stockpile 1250 LF Conveyor,Horizontal Belt 24"Belt,61.5' 20.00 EA $2,825.00 $56,500.00 <br /> Length $56500.00 <br /> Elevated Conveyor- 570 LF Conveyor, 9.00 EA $2,825.00 $25,425.00 <br /> P5 to Stockpile Horizontal Belt 24"Belt,61.5' <br /> Length $25425.00 <br /> Conveyor-Raw Storage to 160 Conveyor,Horizontal Belt 24"Belt,61.5' 3.00 EA $2,825.00 $8,475.00 <br /> Screening Length $8475.00 <br /> Wash-Down Pad at No.5 Mine 52'x 25'x12" Demo.and on-site disposal in excavated pit,12 1,300.00 SF $1.71 $2,217.80 <br /> in.thick-Max.200 ft. <br /> push $2217.80 <br /> -Footers 2'x3'x243 LF Demo.and on-site disposal in excavated pit, 243.00 LF $10.75 $2,612.25 <br /> 2.0 ft.x 3 ft.-Max.200 ft.push <br /> $2612.25 <br /> Portal No.5 10'x 10'x Bldg.(MN) 1,000.00 CF $0.22 $216.00 <br /> Pumphouse 10, demo./on-site disposal in excavated pit-Max. <br /> 200 ft.push $216.00 <br /> Rotary Breaker 60'x 60'x Bldg.(MN) 144,000.00 CF $0.22 $31,104.00 <br /> 40' demo./on-site $31104.00 <br /> -Footers 1'x 2'x200LF Demo.and on-site disposal in excavated pit, 200.00 LF $3.58 $716.00 <br /> 1.0 ft.x 2 ft.- <br /> Max.200 ft.push <br /> $716.00 <br /> 3 <br />