TASK 001 STRUCTURE DEMO BREAKDOWN
<br /> Structure or Item Description Dimensions Demolition Quantity Unit Unit Cost Total Cost SL5
<br /> Menu Selection
<br /> -Footers 1'x2'x252 LF Demo.and on-site disposal in excavated pit, 252.00 LF $3.58 $902.16
<br /> 1.0 ft.x 2 ft.-Max.200 ft.push
<br /> $902.16
<br /> -Pad 70'x60'x6" Demo.and on-site disposal in excavated pit,6 4,200.00 SF $0.85 $3,582.60
<br /> in.thick-Max.200 ft.push $3582.60
<br /> 36-inch Overland 900 LF Conveyor, 15.00 EA $2,825.00 $42,375.00
<br /> Conveyor to Sample Building Horizontal Belt 24"Belt,61.5'
<br /> Length $42375.00
<br /> Silo Transfer Conveyor;Sample 600 LF Conveyor,Horizontal Belt 24"Belt,61.5' 10.00 EA $2,825.00 $28,250.00
<br /> Building to Silo Length $28250.00
<br /> Silo;10,000 Storage Silo 70'D x 25'h Explosive demolition,large projects-Concrete 384,845.00 CF $0.28 $107,756.60
<br /> structures
<br /> $107756.60
<br /> -Push Concrete into 14000 CY Cat D10T- 16.00 EA $292.54 $4,680.64
<br /> fill 10SU $4680.64
<br /> -Silo Footers 2'x 3'x 220LF Demo.and on-site disposal in excavated pit, 220.00 LF $10.75 $2,365.00
<br /> 2.0 ft.x 3 ft.-Max.200 ft.
<br /> push
<br /> $2365.00
<br /> Laboratory/Sample Building Trailer Bldg.(SN)demo./on-site disposal in excavated 1,792.00 CF $0.20 $353.02
<br /> pit-
<br /> Max.200 ft.push $353.02
<br /> Remove Rail Spur 11600 LF Railroad track- 11,600.00 LF $9.19 $106,604.00
<br /> Ties and track $106604.00
<br /> -Remove Ballast 3900 CY Railroad track-Ballast 3,900.00 CY $4.67 $18,213.00 $18213.00
<br /> Electrical Substations(4) 4 NON-PCB 4.00 EA $2,082.20 $8,328.80
<br /> Transformer Removal $8328.80
<br /> -Pad 20'x 20'x Demo.and on-site disposal in existing pit,6 in. 400.00 SF $0.81 $325.20
<br /> 6" thick-Max.
<br /> 200 ft.push $325.20
<br /> -Fencing 750 LF Fencing,chain link,including posts and 750.00 LF $3.06 $2,295.00
<br /> fabric-8 ft.to 10 ft.high $2295.00
<br /> Fuel Island at No.5 Portals 30'x 40'x Demo.and on-site disposal in excavated pit,6 1,200.00 SF $0.85 $1,023.60
<br /> 6" in.thick-
<br /> Max.200 ft.push $1023.60
<br /> Overland Conveyor-P5 to Stockpile 1250 LF Conveyor,Horizontal Belt 24"Belt,61.5' 20.00 EA $2,825.00 $56,500.00
<br /> Length $56500.00
<br /> Elevated Conveyor- 570 LF Conveyor, 9.00 EA $2,825.00 $25,425.00
<br /> P5 to Stockpile Horizontal Belt 24"Belt,61.5'
<br /> Length $25425.00
<br /> Conveyor-Raw Storage to 160 Conveyor,Horizontal Belt 24"Belt,61.5' 3.00 EA $2,825.00 $8,475.00
<br /> Screening Length $8475.00
<br /> Wash-Down Pad at No.5 Mine 52'x 25'x12" Demo.and on-site disposal in excavated pit,12 1,300.00 SF $1.71 $2,217.80
<br /> in.thick-Max.200 ft.
<br /> push $2217.80
<br /> -Footers 2'x3'x243 LF Demo.and on-site disposal in excavated pit, 243.00 LF $10.75 $2,612.25
<br /> 2.0 ft.x 3 ft.-Max.200 ft.push
<br /> $2612.25
<br /> Portal No.5 10'x 10'x Bldg.(MN) 1,000.00 CF $0.22 $216.00
<br /> Pumphouse 10, demo./on-site disposal in excavated pit-Max.
<br /> 200 ft.push $216.00
<br /> Rotary Breaker 60'x 60'x Bldg.(MN) 144,000.00 CF $0.22 $31,104.00
<br /> 40' demo./on-site $31104.00
<br /> -Footers 1'x 2'x200LF Demo.and on-site disposal in excavated pit, 200.00 LF $3.58 $716.00
<br /> 1.0 ft.x 2 ft.-
<br /> Max.200 ft.push
<br /> $716.00
<br /> 3
<br />
|