Laserfiche WebLink
TASK 001 STRUCTURE DEMO BREAKDOWN <br /> Structure or Item Description Dimensions Demolition Quantity Unit Unit Cost Total Cost SL5 <br /> Menu Selection <br /> -Pad 60'x 40'x Demo.and on-site disposal in excavated pit,6 2,400.00 SF $0.85 $2,047.20 <br /> 6" in.thick- <br /> Max.200 ft.push $2047.20 <br /> 12 Inch Culverts 170 LF Pipe,corrugated metal(CMP)- 170.00 LF $2.81 $477.70 <br /> 12 in.diameter pipe $477.70 <br /> 15 Inch Culverts 115 LF Pipe,corrugated metal(CMP)-15 in.diameter 115.00 LF $3.28 $377.43 <br /> pipe $377.43 <br /> 18 Inch Culverts 1280 LF Pipe, 1,280.00 LF $3.78 $4,839.68 <br /> corrugated metal(CMP)-18 in.diameter pipe <br /> $4839.68 <br /> 20/21 Inch Culverts 100 LF Pipe,corrugated 100.00 LF $4.35 $434.60 <br /> metal(CMP)- $434.60 <br /> 30 Inch Culverts 40 LF Pipe,corrugated metal(CMP)-30 in.diameter 40.00 LF $6.29 $251.64 <br /> pipe <br /> $251.64 <br /> 36 Inch Culverts 170 LF Pipe,corrugated metal(CMP)-36 in.diameter 170.00 LF $7.53 $1,280.44 <br /> pipe <br /> $1280.44 <br /> 54 Inch Culverts 200 LF Pipe,corrugated metal(CMP)- 200.00 LF $14.31 $2,862.00 <br /> 60 in.diameter pipe $2862.00 <br /> Asbestos Sampling 80 Samples Personal PCM sampling and analysis,4 to 8 80.00 EA $106.28 $8,502.40 <br /> samples/day- <br /> Average $8502.40 <br /> TASK 001 TOTAL: $800907.31 <br /> 4 <br />