My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-14_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-10-14_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:40:13 PM
Creation date
10/14/2020 12:20:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
10/14/2020
Doc Name
Reclamation Cost Estimate
Type & Sequence
PR10
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 12 of 20 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil in J Pit East -segment 1 <br />Site: Trapper Mine Permit Action: PR10 Permit/Job#: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: N14A State: Colorado <br />Date: 10/9/2020 County: Moffat <br />User: RAR <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: CO10-N14a <br />COST Shift basis: 1 per day <br />iption <br />Support Equipment -Load Area: <br />-Dump Area: <br />Cat D10T - IOSU <br />Cat D10T - IOSU <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />CAT 16M <br />Water Tanker, 2,500 Gal. <br />Cnst Breakrinwn: Scraner Wnrk Team Snnnnrt Enninment Maintenance Enninment <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />50 <br />50 <br />50 <br />60 <br />Ownership cost/hour: <br />$181.30 <br />NA <br />$170.04 <br />$170.04 <br />$55.79 <br />$10.06 <br />Operating cost/hour: <br />$203.87 <br />NA <br />$76.51 <br />$76.51 <br />$30.04 <br />$11.27 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$30.90 <br />NA <br />$41.30 <br />$41.30 <br />$28.56 <br />$21.12 <br />Unit Subtotals: <br />$416.07 <br />NA <br />$287.85 <br />$287.85 <br />$114.39 <br />$42.45 <br />Number of Units: <br />8 <br />0 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$3,328.56 <br />Support: <br />$575.70 <br />Maint: <br />$156.84 <br />Total work team cost/hour: $4,061.10 <br />MATERIAL QUANTITIES <br />Initial volume: 1,404 CCY Swell factor: 1.000 <br />Loose volume: 1,404 LCY <br />Source of estimated volume: PR10 Tables A-9.1, A-10.4and TALPACS Summary (TMI) <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,550 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Dry packed <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />32.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.