My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-14_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-10-14_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:40:13 PM
Creation date
10/14/2020 12:20:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
10/14/2020
Doc Name
Reclamation Cost Estimate
Type & Sequence
PR10
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 13 of 20 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 6400 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(f m) <br />Travel Time <br />(min) <br />1 <br />2581.00 <br />1.60 <br />3.00 <br />4.60 <br />1867 <br />1.50 <br />Haul Time: 1.50 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(f m) <br />Travel Time <br />(min) <br />1 <br />2581.00 <br />-1.60 <br />3.00 <br />1.40 <br />2963 <br />0.99 <br />Return Time: <br />0.99 <br />minutes <br />Total Scraper team cycle time: <br />4.09 <br />minutes <br />Adjusted for job conditions: <br />706.21 <br />LCY/Hour <br />Selected Number of Scrapers: <br />8 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />2,824.84 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />2,824.84 <br />LCY/Hour <br />Unadjusted unit production/hour: 850.86 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.438 /LCY <br />Total job time: 0.50 Hours <br />Total job cost: $2,018 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.