Laserfiche WebLink
Page 11 of 20 <br />Truck Cvcle Time: <br />Truck Exchange Time: 0.80 Minutes <br />Truck Load Time: 1.494 Minutes <br />Truck Maneuver and Dump 1.20 Minutes <br />Time: <br />Adjusted for site altitude <br />Adjusted for site altitude <br />Adjusted for site altitude <br />0.800 <br />Minutes <br />1.494 <br />Minutes <br />1.200 <br />Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />2616.00 <br />0.00 <br />3.00 <br />3.00 <br />2409 <br />1.624 <br />Haul Time <br />Return Route: <br />1.624 <br />minutes <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />2616.00 <br />0.00 <br />3.00 <br />3.00 <br />3503 <br />1.124 <br />Retum Time: 1.124 <br />minutes <br />Total Truck Cycle Time: 6.242 <br />minutes <br />Loading Toot unit <br />Production <br />3,812.84 <br />LCY/Hour Adjusted for job efficiency: <br />3,164.66 LCY/Hour <br />Truck Unit Production <br />1,401.26 <br />LCY/Hour Adjusted for job efficiency: <br />1,163.04 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 3,489.13 <br />LCY/Hour <br />Adjusted single tmck/loader team production: 3,164.66 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 3,164.66 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 186.42 <br />Hours <br />Unit cost: <br />$0.971 <br />/LCY Total job cost: $572,748 <br />CIRCES Cost Estimating Software <br />