My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-13_REVISION - M2017035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017035
>
2020-10-13_REVISION - M2017035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 4:12:43 AM
Creation date
10/14/2020 9:18:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017035
IBM Index Class Name
REVISION
Doc Date
10/13/2020
Doc Name
Adequacy Review Response
From
Miners Mall, LLC
To
DRMS
Type & Sequence
AM1
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br /> 16.At what point will mining conclude and reclamation commence? <br /> The deposit is HUGE! To be honest, I believe mining and reclamation will go on well beyond the <br /> scope of this current amendment,and my lifetime if current hand tool methods are used. <br /> Machinery would destroy the museum and facet grade material currently being mined. <br /> Knowing that there many be future amendments or technical revisions, here is a time-line to <br /> show the"timing" of the phases, project areas and operations. <br /> Phase 1 2 3 4 5 <br /> Project Area Ridgetop Siberia Midway Connector Purple Pipe Unnamed <br /> AOD(acres) 0.25 0.05 0.08 0.01 0.01 0.02 <br /> Fence Dec2020: Dec2020: <br /> 2020 Installation Site Start <br /> Preparation Operations <br /> 2021 Start Sort/Stack <br /> Operations Material <br /> 2022 Fall 2022: Start/ <br /> Start Complete <br /> Reclamation operations <br /> 2023 Monitor Start Start Prospect <br /> Reclamation Reclamation operations <br /> 2024 Monitor Monitor Start <br /> Reclamation Reclamation operations <br /> —Technical <br /> Revision <br /> 2025 Start Full Unsure of Material Monitor Start Full Unsure of <br /> Reclamation status may be Reclamation Reclamation status <br /> (May moved to <br /> extend) Ridgetop <br /> 2026 Monitor Unsure of Monitor Monitor Monitor Unsure of <br /> Reclamation status— Reclamation Reclamation Reclamation status— <br /> (May Permit Permit <br /> extend) Amended Amended <br /> 2027 Monitor Unsure of Monitor Monitor Monitor Unsure of <br /> Reclamation status Reclamation Reclamation Reclamation status <br />
The URL can be used to link to this page
Your browser does not support the video tag.