My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-13_REVISION - M2017035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017035
>
2020-10-13_REVISION - M2017035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 4:12:43 AM
Creation date
10/14/2020 9:18:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017035
IBM Index Class Name
REVISION
Doc Date
10/13/2020
Doc Name
Adequacy Review Response
From
Miners Mall, LLC
To
DRMS
Type & Sequence
AM1
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Siberia Project Area: <br /> The project area sits at the bottom of the ridge. Any erosion comes down to this point! <br /> We will be monitoring the erosion and make needed changes to prevent UUD issues. <br /> This Project Area is divided into 4 areas of reclamation: <br /> 1) Portal Grate—Access control will be given back to BLM/DRMS via universal master <br /> lock and Miners Mall will remove their lock. <br /> 2) Area of Disturbance around the Grate—This is mostly barren since the grate was <br /> installed in 1996. Based on erosion observations during the life of this project, <br /> Miners Mall will report their finding to the DRMS for suggestions on post-mining <br /> reclamation (IE: adding a layer of mulch, seed,then topsoil.) <br /> 3) Support Area—This area will be dismantled; and the area will be mulched, seeded <br /> and a fine layer of soil added. This area is currently housing a large brittle prickly- <br /> pear cactus colony. <br /> 4) Trails—All trails leading to the hand ripped, mulched, seeded, and then turned to <br /> lock in mulch and seeds. Overseeding of the trail edges will be done every 2 years, <br /> so that as trail traffic decreases, seed banks will be created. <br /> Siberia Project Area will have NO waste rock or storage piles. All material will be <br /> removed offsite for processing. There will be NO cubic yards of anything to move during <br /> reclamation. <br /> Enriched soil can be brought down from Midway Project if DRMS determines that soil <br /> needs to be added to any part of the Siberia Project Reclamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.