Laserfiche WebLink
BULLDOZER WORK <br /> Task description: Grade slopes to 3H:1V max <br /> Site: Revenue Mine Permit Action: TR-011 <br /> Permit/Job#: M-2012-032 <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: CRG <br /> Cost Breakdown: <br /> HOURLY EQUIPMENT COST <br /> Utilization% <br /> Ownership Cost/Hour: $100.59 NA <br /> Operating Cost/Hour: $87.23 100 <br /> Ripper own. Cost/Hour: $0.00 NA <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: r $41.85 NA <br /> Total unit Cost/Hour: $229.67 <br /> Total Fleet Cost/flour: $229.67 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 3,045 disturbance areas will be constructed to final grade <br /> Swell factor: 1 <br /> Loose volume: 3,045 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br />