Laserfiche WebLink
DEMOLITION WORK <br /> Task description Dispose of mill chemicals <br /> Site Revenue Mine Permit Action TR-01I Permit/Job# M-2012-032 <br /> UNIT COST Location adjustment 94 70% <br /> Structure or Item Dimensions Demolition Menu Selection Quantity Unit Unit Cost Total Cost <br /> Description <br /> Hazardous waste removal-Bulk <br /> Mill item(I) Drum/llq qty solids,large quantities(over 15 400 TON $1,810.74 $7,242 96 <br /> tons <br /> Hazardous waste removal-Bulk <br /> Mill item(2) Container/dry qty liquids,large quantities(over 2,500 100000 GAL $2 05 $2,050 00 <br /> a1 <br /> Solid transport,large truck(max 80 <br /> Mill item(3) Transporatlon drums,25 cy,or 18 tons)- 50000 MI $3 95 $1,975 00 <br /> Mtmmum <br /> Mill item(4) Disposal Dumpsite disposal charge-Average 2000 TON $277 50 $5,550 00 <br /> Total Cost <br /> (adjusted for <br /> Job Hours: 10 Subtotal(unadjusted): $16,817.96 location): $15,926.61 <br />