My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-08_REVISION - M2012032 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2020-09-08_REVISION - M2012032 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 4:11:03 AM
Creation date
9/8/2020 9:31:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
9/8/2020
Doc Name
Adequacy Review Response
From
Ouray Silver Mines
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> HOURLY PRODUCTION <br /> Average push distance: 90 Feet <br /> Unadjusted hourly production: 1,353 LCY/hr <br /> Materials consistency description: Rock,well ripped or blasted 0.8 <br /> Average push gradient: 0% <br /> Average site altitude: 10,650 feet <br /> Material weight: 2,900 Lbs/LCY <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br /> Job Condition Correction Factor: <br /> Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.800 (CATHB) <br /> Dozing method 1.000 (GEN.) <br /> Visibility: 0.800 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-MF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weightl 0.793 1 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.2527 <br /> Adjusted unit production: 341.57 LCY/hr <br /> Adjusted fleet production: 341.57 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit Cost: $ 0.672 LCY <br /> Total job time: 8.91 Hours <br /> Total job cost: $2,047 <br />
The URL can be used to link to this page
Your browser does not support the video tag.