Rule 3.02.2- Perfonuance BondDetermination <br />DRMS August 2020 <br />The PRIO application requests 155.0 acres of new disturbance and 51-7 acres <br />of redisturbance of Phase III bond released lands. This, according to DRMS <br />amounts to 206.7 acres of new disturbance. Trapper's Appendix A submitted <br />with the PR10 application only accounts for 80.72 acres of reclamation located <br />in J Pit. It appears that TMI is only bonding for a fraction of the area of <br />requested disturbance. <br />3. Please clarify and justify the cost estimate submitted with the application. <br />Trapper Respons e to Co m m ent 3: 111 e ove rbu rden remo wa 1/til i' ' - in I fl-nd Jning sequenec <br />P <br />.vaste 1.11ate]"al ftom wic pit to be backfilfled into an -oilier pit. rF AS Utilizes the N, --he waste <br />inaterial fi-oni the ni-itial -pit rnLiSt bC Placed ill an Oat of'pit spoil dtil-np. Spoil inatcrial <br />from sLibsequent pits is hauled back -to the prior nihied-out pit. 'I'll's rest.ilts in, the prior pit <br />1. <br />being backfilled as the new pit is being developed. 1"herel'ore, th-e assuttiption w, --is imade. <br />thirlt bef'ore th-e Worst. -Case Boiad Year occLus, 1nost of the I and Jpits complex Nvould be <br />backfilled, topsoiled., and revegotcited prior to the Rond. Ye',Ar of" .")Q1. <br />The u,-ible above., shows that it is anticip,--rited hCaV1.11 0111 Y 8 0. 7 acres o f op eii 'I aiids at t h <br />elid of tine pennit, teen that Ldtil.11atCly needs to be reclaimed. It is atiticipate(.1 tliat tl-)el <br />will be L2.6 acres of reclai'med land that will not be Phase Bond Released as yet. <br />`Frapper SUbmitted the PR 10 application prior to the 1hial approval of the PR 9 aPplicat ioll, <br />'ill Wilich CorrCetions we're 1,nade regarding this saine got, tjj,,,�jt, la -11(1.s <br />(� , st.1111p t I assumed to be <br />-grad d, lopsoiled, and revegetated, prior to the Worst -Case Bond Ye,,'(,�ir wotifd r qulre <br />tn e <br />,f)dditiotial work (see Circes 11i as k R N YB R.' ). UtifiAng this satne pt-emlse, the Bond <br />EstRI imate for P 0 has bi <br />ben re to include thesc I A26.0 acres ofRNYBR iii I aiid J <br />2020 <br />2021 <br />2022 <br />Total <br />Acres <br />Acres <br />Acres <br />Acres <br />Disturbed Acres <br />I Pit Middle <br />31.9 <br />31.9 <br />1 Pit East <br />37.7 <br />37.7 <br />J Pit Middle <br />56.5 <br />56.5 <br />J Pit East <br />28.4 <br />51.5 <br />79.9 <br />OB Pile <br />0.9 <br />0.9 <br />Total Disturbed <br />61.1 <br />145.6 <br />- <br />206.7 <br />Reclaimed Acres <br />I Pit Middle <br />31.9 <br />31.9 <br />1 Pit East <br />23.4 <br />23.4 <br />J Pit Middle <br />56.5 <br />56.5 <br />J Pit East <br />14.2 <br />14.2 <br />Total Reclaimed <br />31.9 <br />94.1 <br />126.0 <br />Net Open Acres <br />61.1 <br />174.8 <br />80.7 <br />The u,-ible above., shows that it is anticip,--rited hCaV1.11 0111 Y 8 0. 7 acres o f op eii 'I aiids at t h <br />elid of tine pennit, teen that Ldtil.11atCly needs to be reclaimed. It is atiticipate(.1 tliat tl-)el <br />will be L2.6 acres of reclai'med land that will not be Phase Bond Released as yet. <br />`Frapper SUbmitted the PR 10 application prior to the 1hial approval of the PR 9 aPplicat ioll, <br />'ill Wilich CorrCetions we're 1,nade regarding this saine got, tjj,,,�jt, la -11(1.s <br />(� , st.1111p t I assumed to be <br />-grad d, lopsoiled, and revegetated, prior to the Worst -Case Bond Ye,,'(,�ir wotifd r qulre <br />tn e <br />,f)dditiotial work (see Circes 11i as k R N YB R.' ). UtifiAng this satne pt-emlse, the Bond <br />EstRI imate for P 0 has bi <br />ben re to include thesc I A26.0 acres ofRNYBR iii I aiid J <br />