Rule 3.02.2- Perfonuance BondDetermination
<br />DRMS August 2020
<br />The PRIO application requests 155.0 acres of new disturbance and 51-7 acres
<br />of redisturbance of Phase III bond released lands. This, according to DRMS
<br />amounts to 206.7 acres of new disturbance. Trapper's Appendix A submitted
<br />with the PR10 application only accounts for 80.72 acres of reclamation located
<br />in J Pit. It appears that TMI is only bonding for a fraction of the area of
<br />requested disturbance.
<br />3. Please clarify and justify the cost estimate submitted with the application.
<br />Trapper Respons e to Co m m ent 3: 111 e ove rbu rden remo wa 1/til i' ' - in I fl-nd Jning sequenec
<br />P
<br />.vaste 1.11ate]"al ftom wic pit to be backfilfled into an -oilier pit. rF AS Utilizes the N, --he waste
<br />inaterial fi-oni the ni-itial -pit rnLiSt bC Placed ill an Oat of'pit spoil dtil-np. Spoil inatcrial
<br />from sLibsequent pits is hauled back -to the prior nihied-out pit. 'I'll's rest.ilts in, the prior pit
<br />1.
<br />being backfilled as the new pit is being developed. 1"herel'ore, th-e assuttiption w, --is imade.
<br />thirlt bef'ore th-e Worst. -Case Boiad Year occLus, 1nost of the I and Jpits complex Nvould be
<br />backfilled, topsoiled., and revegotcited prior to the Rond. Ye',Ar of" .")Q1.
<br />The u,-ible above., shows that it is anticip,--rited hCaV1.11 0111 Y 8 0. 7 acres o f op eii 'I aiids at t h
<br />elid of tine pennit, teen that Ldtil.11atCly needs to be reclaimed. It is atiticipate(.1 tliat tl-)el
<br />will be L2.6 acres of reclai'med land that will not be Phase Bond Released as yet.
<br />`Frapper SUbmitted the PR 10 application prior to the 1hial approval of the PR 9 aPplicat ioll,
<br />'ill Wilich CorrCetions we're 1,nade regarding this saine got, tjj,,,�jt, la -11(1.s
<br />(� , st.1111p t I assumed to be
<br />-grad d, lopsoiled, and revegetated, prior to the Worst -Case Bond Ye,,'(,�ir wotifd r qulre
<br />tn e
<br />,f)dditiotial work (see Circes 11i as k R N YB R.' ). UtifiAng this satne pt-emlse, the Bond
<br />EstRI imate for P 0 has bi
<br />ben re to include thesc I A26.0 acres ofRNYBR iii I aiid J
<br />2020
<br />2021
<br />2022
<br />Total
<br />Acres
<br />Acres
<br />Acres
<br />Acres
<br />Disturbed Acres
<br />I Pit Middle
<br />31.9
<br />31.9
<br />1 Pit East
<br />37.7
<br />37.7
<br />J Pit Middle
<br />56.5
<br />56.5
<br />J Pit East
<br />28.4
<br />51.5
<br />79.9
<br />OB Pile
<br />0.9
<br />0.9
<br />Total Disturbed
<br />61.1
<br />145.6
<br />-
<br />206.7
<br />Reclaimed Acres
<br />I Pit Middle
<br />31.9
<br />31.9
<br />1 Pit East
<br />23.4
<br />23.4
<br />J Pit Middle
<br />56.5
<br />56.5
<br />J Pit East
<br />14.2
<br />14.2
<br />Total Reclaimed
<br />31.9
<br />94.1
<br />126.0
<br />Net Open Acres
<br />61.1
<br />174.8
<br />80.7
<br />The u,-ible above., shows that it is anticip,--rited hCaV1.11 0111 Y 8 0. 7 acres o f op eii 'I aiids at t h
<br />elid of tine pennit, teen that Ldtil.11atCly needs to be reclaimed. It is atiticipate(.1 tliat tl-)el
<br />will be L2.6 acres of reclai'med land that will not be Phase Bond Released as yet.
<br />`Frapper SUbmitted the PR 10 application prior to the 1hial approval of the PR 9 aPplicat ioll,
<br />'ill Wilich CorrCetions we're 1,nade regarding this saine got, tjj,,,�jt, la -11(1.s
<br />(� , st.1111p t I assumed to be
<br />-grad d, lopsoiled, and revegetated, prior to the Worst -Case Bond Ye,,'(,�ir wotifd r qulre
<br />tn e
<br />,f)dditiotial work (see Circes 11i as k R N YB R.' ). UtifiAng this satne pt-emlse, the Bond
<br />EstRI imate for P 0 has bi
<br />ben re to include thesc I A26.0 acres ofRNYBR iii I aiid J