Laserfiche WebLink
Mobilization Worksheet Cont'd Task#04A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: NUCLA <br /> Total one-way travel distance: 10.00 miles <br /> Average Travel Speed: 35.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $842.11 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $6.99 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.29 0.29 <br /> Return Time(Hours): 0.29 0.29 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 1.57 0.57 <br /> JOB TIME AND COST <br /> Total job time: 3.14 Hours <br /> Total job cost: $849 <br /> CIRCES Cost Estimating Software <br />