My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-01_PERMIT FILE - M2019007
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019007
>
2020-09-01_PERMIT FILE - M2019007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 4:00:44 AM
Creation date
9/1/2020 7:45:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019007
IBM Index Class Name
Permit File
Doc Date
9/1/2020
Doc Name
Completeness Response
From
Asteroid Explorations
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilize reclamation crew/equipment <br /> Site: Kichelmann one Permit Action: 2019-04-02 Permit/Job#: M2019007 <br /> PROJECT IDENTIFICATION <br /> Task#: 04A State: Colorado Abbreviation: None <br /> Date: 4/2/2019 County: Montrose Filename: M007-04a <br /> User: DMC <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $16.63 $18.37 $22.33 <br /> Operating Cost/Hour: $44.38 $46.13 $50.07 <br /> Operator Cost/Hour: $27.66 $27.66 $27.66 <br /> Helper Cost/Hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> TONS t fleet <br /> CAT 450E 9.80 $24.67 $88.67 1 $113.34 $88.67 $250.00 <br /> Subtotals: 1 $11334 $88.67 $250.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4x4,3/4 T. $12.23 1 $12.23 $12.23 <br /> Subtotals: $12.23 $12.23 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.