Laserfiche WebLink
Reveg Worksheet Cont'd Task#03A Page 2 of 2 <br /> MULCHING and MISCELLANEOUS <br /> Materials <br /> Units/ <br /> Description Acre Unit Cost/Unit Cost/Acre <br /> Straw,delivered MEANS 3125 14.16 1200 2.00 TON $288.00 $576.00 <br /> Total Mulch Materials Cost/Acre $576.00 <br /> A pplication <br /> Description Cost/Acre <br /> Crimping,with tractor JDMG survey datal $68.78 <br /> Total Mulch Application Cost/Acre $68.78 <br /> NURSERY STOCK PLANTING <br /> No / Planting Fertilizer <br /> Common Name Acre Type and Size Cost Pellet Cost Cost/Acre <br /> Totals Nursery Stock Cost/Acre $0.00 <br /> JOB TIME AND COST <br /> No.of Acres: 2 Cost/Acre: $1,794.93 <br /> Estimated Failure Rate: 25% Cost/Acre*: $1,794.93 <br /> *Selected Replanting Work Items: TILLING,SEEDING,MULCHING <br /> Initial Job Cost: $3,589.86 <br /> Reseeding Job Cost: $897.47 <br /> Total Job Cost: $4,487 <br /> Job Hours: 2.00 <br /> CIRCES Cost Estimating Software <br />