Laserfiche WebLink
7 Interim Management Plan 15 <br /> 7.1 Measures to Stabilize Excavations and Workings 15 <br /> 7.2 Measures to Isolate or Control Toxic or Deleterious Materials 15 <br /> 7.3 Measures to Maintain the Project Area in a Safe and Clean Condition 15 <br /> 7.4 Schedule of Anticipated Periods of Temporary Closure 15 <br /> 7.5 Temporary or Seasonal Closures 15 <br /> 8 Statement of Assumption of Reclamation Responsibility 16 <br /> 9 Reclamation Cost Estimate 16 <br /> 10 Effect of Proposed Reclamation on Public Safety 16 <br /> 11 Acknowledgments 17 <br /> List of Appendices <br /> Appendix A: Figures <br /> Figure 1: Site Location Map 18 <br /> Figure 2: Project Overview Map 19 <br /> Figure 3: Travel Route to Project Area 20 <br /> Figure 4: Site Project Map 21 <br /> Figure 5: Grate/ Portal Photos 21 <br /> Figure 6: Reclamation Map 25 <br /> Appendix B: DRMS Reclamation Bond Information 26 <br />