Laserfiche WebLink
Miners Mall, LLC <br /> Humming Bird Mine <br /> Revised Plan of Operations <br /> Table of Contents <br /> 1 Introduction 1 <br /> 2 Operator/Claim Information 2 <br /> 3 Description of Project 3 <br /> 3.1 Project Location 3 <br /> 3.2 Surface Ownership of the land within the Area of Operation 3 <br /> 3.3 Description of Area to the Disturbed 3 <br /> 3.4 Description of Operation 4 <br /> 3.5 Schedule of Operations 7 <br /> 3.6 Existing Disturbance 7 <br /> 4 Operating Plans 8 <br /> 4.1 Water Management Plan 8 <br /> 4.2 Spill Contingency Plan 8 <br /> 4.3 Access Road Maintenance Plan 8 <br /> 4.4 Fire Management Plan 8 <br /> 4.5 Solid and Hazardous Waste Plan 8 <br /> 4.6 Rock Characterization and Handling Plan 8 <br /> 4.7 Quality Assurance Plan 8 <br /> 4.8 Environmental Protection Measures 9 <br /> 5 Reclamation Plan 12 <br /> 5.1 Schedule 12 <br /> 5.2 Post Mining Land Use 12 <br /> 5.3 Buildings, Structures and Equipment Removal 12 <br /> 5.4 Post Closure Management 12 <br /> 5.5 Measures to be Taken During Extended Periods of Non-Operation 13 <br /> 6 Monitoring Plan 14 <br /> 6.1 Compliance with the Approved Plan of Operations and other Federal <br /> and State Environmental Laws and Regulations 14 <br /> 6.2 Provide Early Detection of Potential Problems 14 <br /> 6.3 Supply Information that will assist in detecting Corrective Actions <br /> should they become Necessary 14 <br /> 6.4 Description of Resources Subject to Monitoring 14 <br /> 6.5 Type and Location of Monitoring Devices 14 <br /> 6.6 Reporting Procedures 14 <br />