Laserfiche WebLink
NEWMONT <br /> GOLDCORR <br /> Scenario Permit Criteria Reporting Additional <br /> Timeframe considerations <br /> health, property or <br /> the environment <br /> Failure or imminent None specified Within 24 hours of the None <br /> failure of an EPF event <br /> identified in the EPP* <br /> Ex of peg corKWions <br /> Underdrains The 30-day running After confirmation of Refer to section 3.3 <br /> average of CNwAD the initial monitoring of Exhibit G <br /> monitoring data for results <br /> an underdrain <br /> exceeds 1.0 mg/L <br /> and the 30-day <br /> running average pH <br /> value from monitoring <br /> data for the <br /> same underdrain for <br /> the same period <br /> exceeds 9.0. <br /> Leak Detection The 30-day running After confirmation of Refer to section 3.3 <br /> System (LDS) average of CNwAp the initial monitoring of Exhibit G <br /> monitoring data for a results <br /> LDS exceeds 0.5 <br /> mg/L <br /> and the 30-day <br /> running average pH <br /> value for the same <br /> LDS monitoring data <br /> for the same <br /> period exceeds 9.0. <br /> High Volume Solution The average of the After confirmation of Refer to section 3.3 <br /> Collection System water level the initial monitoring of Exhibit G <br /> (HVSCS) monitoring data in the results <br /> PSSAs exceeds 80 <br /> percent of the total <br /> Cripple Creek& Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 13 <br /> 27 <br />