Laserfiche WebLink
NEWMONT <br /> GOLDCORP <br /> Scenario Permit Criteria Reporting Additional <br /> Timeframe considerations <br /> capacity of the PSSA <br /> in a sustained <br /> manner. <br /> Low Volume Solution The transducers After confirmation of Refer to section 3.3 <br /> Collection System monitoring data in the the initial monitoring of Exhibit G <br /> (LVSCS) LVSCS or LDCRS results <br /> exceed two <br /> feet in a sustained <br /> manner. <br /> " Facilities identified as an EPF in the EPP are: AGVLF (lined area), SGVLF (lined area), HGM Platform (lined area), <br /> ESP (lined area),ADR1 (lined area), external storage pond <br /> `*Comprehensive Environmental Response, Compensation, and Liability ACT(CERCLA): Reportable Quantities(RQ) <br /> In the event of a failure or imminent failure of a designated EPF, CC&V will provide notification to <br /> the Division within 24 hours. The notification will include the following information; <br /> 1. Identify that this is a notification of an emergency condition <br /> 2. The nature of the condition including any chemicals and toxic or acid producing materials <br /> involved <br /> 3. An estimate of the quantity of any chemical, toxic or acid-forming material that has been <br /> or could be released <br /> 4. The time and duration of the occurrence and if it is on-going, or urgency of the pending <br /> situation <br /> 5. Any known or anticipated impacts to human health, property or the environment <br /> 6. Precautions and corrective actions taken by CC&V <br /> 7. CC&V's contact information <br /> For spills requiring reporting to another agency, as identified in Rule 3.1.13 of the Hard Rock, <br /> Metal and DMOs, CC&V commits to notifying the division and providing the following information; <br /> 1. Operation name, DRMS permit number and name of person reporting the spill, <br /> Cripple Creek&Victor Gold Mining Company Exhibit U <br /> Cresson Project Amendment 13 <br /> 28 <br />